Advocacy Projects

We have many projects that we are working on or want to work on and not enough volunteers to really keep up to date. You can Download the PDF version of this list.

ID Done? Name description next date(s) current stage BA volunteer/ owner contact todo documentation
    Developments            
1   Estuary Crossing
 
- BMP
-ACBMP
-caltrans biycle document
2  done new main Library 
  • Want an indoor secure bike room for regular visitors and employees, and employee showers. 
  • Racks outside for frequent, shorter visits.
august planning John McCabe Susan Hardie
  • write a letter
  • keep informed of next stages
  • get on mailing list
  • get list of involved committe e members
 
3   Southshore Drive path shoreline access
  • Bayview Drive bike lanes(BMP)
  • South of Bayview Drive bike path
  • Otis Drive bike lanes
            BMP 40
4   INPROGRESS FISC/Catellus   Spring 2007 design  ECC  
    Assist with TDM plan
5                  
6   Alameda Point               
7  
  • Master Developers
  • General Plan
     
  • City Council
  pending
8  done Marina Cove-Kaufman & Broad
  • they may remove the bike lanes from the shoreline road
  • Model homes going up, plus office should include bike parking racks
changes to design lucy MM
Bashir Anastas - Public Works
  • The most we would accept is the removal of the west bound bike lanes.  users could use the bike path, if it is easily accessible from the road.
  • The east bound lane needs to stay.
  • letter written re bike parking racks 7/23
9  done Weinerschnitzel/Rainbow on Webster they need bike racks, but where?   changes to design Jon MM    
10  done wind River bike parking We would like to tour their facilities to see if this can be a good example for other developments.  They should have 120 bike parking spaces.      
11   Northern Shoreline              
12  
  • Encinal Yacht Club (east of Wind River)
Need the path to continue through this area   planning path modifications Lucy MM PW has a money to change this parking lot area to continue the Wind River path around the EYC.  
13  done
  • Barnhill Marina (west of Chevy's)
They have been ordered to complete this path       David Valeska
MM
this should be done soon:)  
14  2007 Southshore center improvements
  • Various improvements to this center need to be made for pedestrian and bicycle safety
     
  • harsch Development -Mike Corbett 521-8100
  • Planning Dept - Doug Garrison
  • Planning Bd - Marilyn Ashcraft
We need to begin talking to them soon Letter to Harsch Development sent Mid June
1516   Beltline         Jean Sweeney
  • Review prelimiary plans with jean
  • Northern waterfront meeting
 
17  1st phase done; Park Street
  • Streetscape committee
  city is awaiting grant 2007 for phase 2        
    tinker Avenue Design may be changing Dec 2006 Hooked to Alameda Landing
  • Catellus
  • Obaid Khan
 
18  done Webster Street Detailed design to begin in Fall 2001   Jon Sue Russels (PW)    
19  inprogress Bridgeside development (Broadway/Blanding)  bike racks are in  shoreline access is in        
19.1   Bike Boulevard on Pacific Avenue This would make a good east west route on the northern side of the island.      Lucy, Ed Contact a street transportation consultant Need to tour other bike boulevards - Berkeley, Palo Alto (Waverly) BMP
20   bike Boulevard on San Jose Avenue
  • This would make a good internal (non shortline) commuter route on the southern side of the island. 
  • This is a perfect street because it is residential. 
  • It goes from the Bay Farm bridge to Grand and close to Sherman
  Need video footage of a ride down some current bike boulevards jacqueline  
  • This is suggested by a san Jose Street resident.
  • this is designated in the bike plan as a bike lane, but bike boulevard would work better and not require removing parking.
 
21   Programs              
22   Bike Rack Assessment Program
  • New businesses should have bike racks
  • How does someone request a bike rack in front of a business?
    Lucy MM List was given to PW We have a list of suggested locations
23   Need a bike coordinator in Public works city is missing a staff person for bike/ped/transit    
24  done through Transportation Commission Bicycle Advisory Committee encourage the city to implement the committee august 30
  • awaiting public transit committee meeting
  • need letter describing the need
lucy Cheri sheets We promote the expansion of a Transportation committee with no voting staff. and to include bicycle, pedestrian and transit sub committees.  
25   Signage
  • Harbor Bay Shoreline path 
  • oakland Access via Park Street Bridge
  • Share the road or similar
  • Add signage along the shoreline path that gives the destinations for each intersection with the path. 
  • Need to direct bicyclists to the safest way to cross the bridge and connect to the embarcadero
  • Add signs to encourage inform autos that bikes have use of the full lane
  • There is also a stencil being developed in SF
      MM
  • Determine the destinations for the intersections.
  • Ask city to add signage
  • determine where signs should be put
  • Determine exact signs that should be used and where
 
26   General Plan modifications Want to get alot of bicycle and alternative mode language into the new general plan     Jon Cynthia Eliason    
27   Northern Waterfront Specific Plan encourage bicycle friendly streets and parking  on sidewalks at commerical streets         Attend meetings
Work with city stat
 
28   MTC regional transportation plan
  • Need to get Alameda specific routes into the plan. 
  • This is for major transportation routes and those routes that connect to major transit points (BART, AMTRAK)
    lucy MTC    
29   MTC regional bike plan
  • Need to get Alameda specific routes into the plan. 
  • This is for major transportation routes and those routes that connect to major transit points (BART, AMTRAK)
    lucy MTC    
30   East Bay Regional Park Bike Plan
  • is there one?
    Lucy
Maria Vargas
MM
Steve and Jaime (EBRPD jperkins@ebparks.org,
sfiala@ebparks.org)
  • Review this plan. 
  • We need more bicycle facilities at Crown Beach and Crab Cove.
 
31   Bicycle water shuttle See Estuary Crossing Campaign <    
  BMP 37
33   Ped and bike bridge over the estuary See Estuary Crossing Campaign           Alamaeda countywide bicycle plan
34  done Bike event parking enforcement law says that for all permitted events expecting more than 100 people    
  • make a list of all Alameda events that should require parking (link)
 
35   zoning law bike parking enforcement
  • that new developments and upgrades add the mandatory bike parking (1 bike parking for every 10 auto spaces)  suggest minimum of two.
  • Need to make sure to suggest, employee all day parking AND visitor parking and showers, too.
        Monitor planning department meetings  
36   Jackson Park bike racks need bike racks next to restroom           BMP Appendix table A
37                  
38   Bike loop detectors
  • Need detectors at every intersection that has an auto loop detector so bicyclists do not need to push button.
  • In bike lanes. If no bike lane than in right auto lane.
  • in bike paths with intersections
  • In left turn lanes.
  • need stencils on the spot where bicyclists should stop
  • is it legal for a bike to go through the intersection if the light does not change
    Lucy
Wali Waziri
  • Some loops have been changed
Alameda County wide bike plan
39   Fruitvale BART 
 
  • the only really bike accessbile BART station from Alameda
       
  • Alamedans are a quarter of the usage of the Fruitvale BART stations
 
39.1  done
  • bikestation
Encourage the fast implementation of a staffed bikestation inside the station like the one at Berkeley BART.       Unity Council -Jenny Kassan (535-6924)
 
39.2 not done
  • bike racks in station
won't happen, but they have put many new bike racks outside the station 8/1/01 they say there is no room        
39.3  
  • City's bike lockers
Encourage PW to make available the 15 city lockers at BART        
39.4  
  • access to BART
improve roadway on Oakland side between Fruitvale Bridge and Bart Entrance begin 8/13/01 Lucy Kathryn Hughes
EBBC Hazard Report
need to fill out EBBC Hazard report
Need to send a letter to Kathryn H describing problems
 
40   signal light timing Check that timing is updated to the bike plan levels         Sherman/Central/encinal intersection  
41  IN PROGRESS Bike Education
  • Adult
  • distribute pamplets
         
42   Bike paths
  • widened to  at least 12'
  • separated ped and bike paths
  • Southshore
  • harbor bay
          BMP
43   Central Avenue bike lanes remove two lanes to continue the bike lanes     Jon MM
Caltrans
between eight and ??? BMP
44 IN PROGRESS with city parking study Bike parking ordinance
  • Change this to be dependent upon people not car parking as swtated in Alameda County bike plan. 
  • The current zoning on page 3062 of the AMC, subsection 30-7.15, states" bike parking be provided at a ratio of 1 bike space for every 10 parking spaces"
          BMP 49
45   Fruitvale Railroad bridge and RR tracks. encourage the creation of a class I path along the west side crossing of Miller-Sweeney bridge.         Review conflicts with Transit plan BMP 49
46  done City bike maps     Dan   Work with Telephone book company to get advretising for a map BMP 12
46.1  done Harbor bay paths mapping map out all the paths and parks that link the cul de sacs in Harbor Bay started 8/7/01   Lucy
Treya
     
47   Atlantic Avenue Bikeway Rail road right of Way(Cross Alameda Trail)
  • Create a "bikeway" along the wide Atlantic Avenue
  • ensure that bike lanes are also put in for commuters since the bikeway is for recreational riders.
  • West sidewalk should be widened to traffic calm
  • separated bike and ped paths
  PW is awaiting notification of grant   MM
  • Bike path should be near the roadway, ped path away from roadway (opposite of the main street greenway)
  • native vegetation, with minimar sprinkers to water the path.
BMP 46
48  done Bay Farm Bridge improvements
  • Wooden bridge lighting
  • metal plate less slippery
  • wooden bridge less slippery
  TDA article grant approved.$75,000 lucy MM These will be implemented by East Bay Reg Parks  
49  done Vision Statement Describe  conditions and facilities for biking that BikeAlameda suggests.
This is meant primarily for new developments like Alameda Point
started 8/1/01   BikeAlameda Board      
50    Bay Farm Bridge / Fernside Blvd Improvements  bi-directional bike path on East side of Fernside for easier access to bridge.  hopefully early 2007  city has won a grant for this.